Professional Install Made Simple:
Begin by digging a 12" x 12" hole and adding a layer of pea gravel for drainage. Insert the ground sleeve, surround it with dry concrete mix, then pour water directly over the top. Allow 24–48 hours for the concrete to cure, ensuring a secure and long-lasting foundation.